COMMERCIAL BUILDING

NCSG

PRE-ENG BUILDING | DESIGN-BUILD | FLOATING CONCRETE STAIR

ACHESON, AB

NCSG

  1. Project Outline
    NCSG brings a suite of experience to Canada’s vast energy corridor, including heavy haul services, refining, utilities, mining, and more across nine facilities. Their Edmonton headquarters and commitment to quality made us a natural fit for their design build project, allowing us to employ local talent in expanding their already impressive operations.

    This 28,250 square foot Behlen Pre-Engineered Facility in Acheson Alberta is the new head office for Northern Crane Services (NCSG). The building is comprised of 15,000sf of two story office space, 16,250sf of shop/parts, 4,500 square feet of wash-bay and 10 acres of graveled yard. This building, yard and adjacent property location consolidated NCSG’s Heavy Haul, Crane, Safety and executive team in one single location.

OFFICE / SERVICE SHOP

FLOATING CONCRETE STAIR

PROJECT SPECIFICATIONS

Completion Date: January 2015

  • END USE

    Office/Service Shop

  • PROJECT SIZE

    28,2580 sq ft. on 9.96 Acres

  • PROJECT DELIVERY METHOD

    Stipulated Price

THE FINAL RESULT

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Integer euismod tortor sit amet diam venenatis, at faucibus ipsum sagittis. Aliquam a venenatis elit, vel posuere nibh. Quisque a erat in elit viverra ultricies. Quisque vel nisi arcu. Integer lorem eros, aliquet sit amet fermentum id, ultricies eu velit. Class aptent taciti sociosqu ad litora torquent per conubia nostra, per inceptos himenaeos. Vestibulum egestas porttitor eros at viverra. Curabitur maximus arcu quis sem convallis, id sagittis justo posuere. Proin blandit feugiat ligula eu congue. Curabitur tempor venenatis elit, ac ornare ante eleifend et.

John Doe, Company

vimeo-video-thumbnail

GET A FREE QUOTE FOR YOUR

GRAIN STORAGE SYSTEM

[forminator_form id="182"]